Skip to main content

Box 7

 Container

Contains 25 Results:

Hearing transcript, April 25, 1983

 File — Box: 7, Folder: 19
Identifier: Folder 19
Scope and Contents From the Collection: The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series. Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates: translation missing: en.enumerations.date_label.created: April 25, 1983

Hearing transcript, April 6, 1983

 File — Box: 7, Folder: 20
Identifier: Folder 20
Scope and Contents From the Collection: The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series. Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates: translation missing: en.enumerations.date_label.created: April 6, 1983

Edison testimony, 1983

 File — Box: 7, Folder: 21
Identifier: Folder 21
Scope and Contents From the Collection: The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series. Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates: translation missing: en.enumerations.date_label.created: 1983

Nuclear Regulatory Commission (NRC) testimony, 1982-1983

 File — Box: 7, Folder: 22
Identifier: Folder 22
Scope and Contents From the Collection: The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series. Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates: translation missing: en.enumerations.date_label.created: 1982-1983

Deposition-Ruth Little, Intervenor witness, 1983

 File — Box: 7, Folder: 23
Identifier: Folder 23
Scope and Contents From the Collection: The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series. Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates: translation missing: en.enumerations.date_label.created: 1983

Intervenor testimony of James Murphy in adequacy of Intervenor survey of medical services and facilities in Illinois Plan for Radiological Accidents (IPRA), no date

 File — Box: 7, Folder: 24
Identifier: Folder 24
Scope and Contents From the Collection: The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series. Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates: translation missing: en.enumerations.date_label.created: no date

Nursing homes administrator testimony, Intervenor witness, 1983

 File — Box: 7, Folder: 25
Identifier: Folder 25
Scope and Contents From the Collection: The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series. Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates: translation missing: en.enumerations.date_label.created: 1983

Intervenor witness testimony prior to stipulation, 1983

 File — Box: 7, Folder: 26
Identifier: Folder 26
Scope and Contents From the Collection: The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series. Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates: translation missing: en.enumerations.date_label.created: 1983

Cross questions-Intervenor, no date

 File — Box: 7, Folder: 27
Identifier: Folder 27
Scope and Contents From the Collection: The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series. Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates: translation missing: en.enumerations.date_label.created: no date

Findings of Facts and Conclusions of Law, 1983

 File — Box: 7, Folder: 28
Identifier: Folder 28
Scope and Contents From the Collection: The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series. Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates: translation missing: en.enumerations.date_label.created: 1983