Box 15
Container
Contains 12 Results:
Safety Evaluation Reports (SER), Nuclear Regulatory Commission (NRC) Staff generated, August 1975
File — Box: 15, Folder: 9
Identifier: Folder 9
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: August 1975
Final Environmental Statement (FES) from construction permit, Nuclear Regulatory Commission (NRC) Staff generated, July 1974
File — Box: 15, Folder: 10
Identifier: Folder 10
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: July 1974