Box 6
Container
Contains 17 Results:
Byron Risk Study: A Probabilistic Risk Evaluation Based on the Zion Probabilistic Safety Study Commonwealth Edison Study, 1983
File — Box: 6, Folder: 18
Identifier: Folder 18
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: 1983
Commonwealth Edison's policy & procedures for maintaining occupational radiation exposures As Low As Reasonable Achievable (ALARA), 1981
File — Box: 6, Folder: 19
Identifier: Folder 19
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: 1981
Commonwealth Edison's radiation protection standards for stations, 1982
File — Box: 6, Folder: 20
Identifier: Folder 20
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: 1982
Instructor's Guide for Nuclear General Employee Training (N-GET) - Edison Training Manual, 1983
File — Box: 6, Folder: 21
Identifier: Folder 21
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: 1983
Sargent & Lundy Engineers, Byron Plant technical specification, 1978
File — Box: 6, Folder: 22
Identifier: Folder 22
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: 1978
Affidavit of Doctor E.J. Sternglass/studies & testimony for Intervenors, 1982
File — Box: 6, Folder: 23
Identifier: Folder 23
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: 1982
Deposition, Doctor Karl Z. Morgan - Intervenor witness, May 27, 1982
File — Box: 6, Folder: 24
Identifier: Folder 24
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: May 27, 1982
Testimony & research, Doctor Karl Z. Morgan - Intervenor witness, 1983
File — Box: 6, Folder: 25
Identifier: Folder 25
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: 1983
Deposition - Doctor Michio Kaku, Intervenor witness, March 12, 1982
File — Box: 6, Folder: 26
Identifier: Folder 26
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: March 12, 1982
Testimony - Nuclear Regulatory Commission (NRC) Staff witnesses, 1982, no date
File — Box: 6, Folder: 29-30
Identifier: Folder 29-30
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: 1982, no date