Skip to main content

Box 22

 Container

Contains 13 Results:

Box 22

 File — Box: 22
Identifier: Box 22
Scope and Contents From the Collection: The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series. Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates: translation missing: en.enumerations.date_label.created: 1969-2008; Other: Date acquired: 11/18/1992

Filings, 1985

 File — Box: 22, Folder: 11
Identifier: Folder 11
Scope and Contents From the Collection: The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series. Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates: translation missing: en.enumerations.date_label.created: 1985

QA/QC Contention: Safety Inspection Report & Notice of Violation, 1980, 1983

 File — Box: 22, Folder: 12
Identifier: Folder 12
Scope and Contents From the Collection: The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series. Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates: translation missing: en.enumerations.date_label.created: 1980, 1983

QA/QC Contention: CECO presentation, 1984

 File — Box: 22, Folder: 13
Identifier: Folder 13
Scope and Contents From the Collection: The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series. Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates: translation missing: en.enumerations.date_label.created: 1984

QA/QC Contention: Quality assurance program coverage of design & construction, March 5, 1984

 File — Box: 22, Folder: 14
Identifier: Folder 14
Scope and Contents From the Collection: The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series. Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates: translation missing: en.enumerations.date_label.created: March 5, 1984

Emergency Contention: Testimony, 1986

 File — Box: 22, Folder: 15
Identifier: Folder 15
Scope and Contents From the Collection: The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series. Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates: translation missing: en.enumerations.date_label.created: 1986

Emergency Contention: Standard Operating Procedure (SOP) - Re-entry, 1985

 File — Box: 22, Folder: 16
Identifier: Folder 16
Scope and Contents From the Collection: The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series. Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates: translation missing: en.enumerations.date_label.created: 1985

Emergency Contention: Standard Operating Procedure (SOP) - Public Information Booklet (BIP) cards maintenance, 1985

 File — Box: 22, Folder: 17
Identifier: Folder 17
Scope and Contents From the Collection: The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series. Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates: translation missing: en.enumerations.date_label.created: 1985

Emergency Contention: Standard Operating Procedure (SOP) - sheltering & evacuation, schools, 1985

 File — Box: 22, Folder: 19
Identifier: Folder 19
Scope and Contents From the Collection: The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series. Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates: translation missing: en.enumerations.date_label.created: 1985

Emergency Contention: Standard Operating Procedure (SOP) - traffic & access control, 1985

 File — Box: 22, Folder: 20
Identifier: Folder 20
Scope and Contents From the Collection: The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series. Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates: translation missing: en.enumerations.date_label.created: 1985