Box 22
Container
Contains 13 Results:
Box 22
File — Box: 22
Identifier: Box 22
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: 1969-2008; Other: Date acquired: 11/18/1992
Filings, 1985
File — Box: 22, Folder: 11
Identifier: Folder 11
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: 1985
QA/QC Contention: Safety Inspection Report & Notice of Violation, 1980, 1983
File — Box: 22, Folder: 12
Identifier: Folder 12
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: 1980, 1983
QA/QC Contention: CECO presentation, 1984
File — Box: 22, Folder: 13
Identifier: Folder 13
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: 1984
QA/QC Contention: Quality assurance program coverage of design & construction, March 5, 1984
File — Box: 22, Folder: 14
Identifier: Folder 14
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: March 5, 1984
Emergency Contention: Testimony, 1986
File — Box: 22, Folder: 15
Identifier: Folder 15
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: 1986
Emergency Contention: Standard Operating Procedure (SOP) - Re-entry, 1985
File — Box: 22, Folder: 16
Identifier: Folder 16
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: 1985
Emergency Contention: Standard Operating Procedure (SOP) - Public Information Booklet (BIP) cards maintenance, 1985
File — Box: 22, Folder: 17
Identifier: Folder 17
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: 1985
Emergency Contention: Standard Operating Procedure (SOP) - sheltering & evacuation, schools, 1985
File — Box: 22, Folder: 19
Identifier: Folder 19
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: 1985
Emergency Contention: Standard Operating Procedure (SOP) - traffic & access control, 1985
File — Box: 22, Folder: 20
Identifier: Folder 20
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: 1985