Box 9
Container
Contains 17 Results:
9c: Edison proposed modifications to Byron Plant steam generators, no date
File — Box: 9, Folder: 16
Identifier: Folder 16
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: no date
9a & 9c: Safety Evaluation Report by Nuclear Regulatory Commission (NRC) Staff of proposed steam generator modifications, March 1983
File — Box: 9, Folder: 17
Identifier: Folder 17
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: March 1983
9a & 9c: Utility group evaluation of proposed steam generator modifications, July 1983
File — Box: 9, Folder: 18
Identifier: Folder 18
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: July 1983
9a & 9c: General docket correspondence, April-July 1983
File — Box: 9, Folder: 19
Identifier: Folder 19
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: April-July 1983
9a: Waterhammer, Edison testimony, 1982
File — Box: 9, Folder: 20
Identifier: Folder 20
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: 1982
9a: Waterhammer, Deposition of Edison witnesses, 1983
File — Box: 9, Folder: 21
Identifier: Folder 21
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: 1983
9a: Nuclear Regulatory Commission (NRC) Staff testimony, 1983
File — Box: 9, Folder: 22
Identifier: Folder 22
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: 1983
9a: Waterhammer Intervenor cross-exam notes, 1983
File — Box: 9, Folder: 23
Identifier: Folder 23
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: 1983
9a: Hearing transcript, March 4, 1983
File — Box: 9, Folder: 24
Identifier: Folder 24
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: March 4, 1983
9a: Waterhammer research from Westinghouse, 1982
File — Box: 9, Folder: 27
Identifier: Folder 27
Scope and Contents
From the Collection:
The DAARE/SAFE records date from 1969 to 2008 and consists of material created, researched, and collected by the two organizations during their legal battle with Commonwealth Edison and the Nuclear Regulatory Commission (NRC) Staff contesting the issuing of an NRC operating license for the Byron Nuclear Plant. The collection is divided into eleven series.
Series 1, the Early DAARE/SAFE Records, is comprised of information created and collected by the two organizations. These records...
Dates:
translation missing: en.enumerations.date_label.created: 1982